Cases

Names and figures verified against source materials. Area: mu in Chinese; approximate m² in English (1 mu ≈ 666.7 m²).

Prefabricated / SEED modular plants

Huimin

Huimin County WWTP

20,000 m³/day · 22.3 mu (~14,870 m²) · 150 days · AAOA-MBR · quasi Class IV

Yixing

Yixing emergency WWTP

5,000 m³/day · 0.75 mu (~500 m²) · 45 days · AO+MBR · quasi Class IV

Simao

Simao River pollution-control emergency

5,000 m³/day · 3.75 mu (~2,500 m²) · 90 days · AAO+MBR · Class 1A

Xinan

Xin’an Town No.2 WWTP emergency expansion

3,000 m³/day · 6.9 mu (~4,600 m²) · 45 days · AAO+MBR · Class 1A

Water supply

Wuchuan

Wuchuan County urban water supply & networks

Guizhou Zunyi Wuchuan · 25,000 t/day · PPP · investment RMB 170 million

Water environment

Zhangjiakou

Zhangjiakou Shili Shahe ecological comprehensive treatment (BT)

Interceptor sewer, dredging, water-body treatment, ecological restoration

Process-package capability cases

Chengde

Chengde sludge harmless treatment (EPC)

200 t/day · high-temperature aerobic fermentation · capability case for the sludge package

Package page →
Pingquan

Pingquan fecal & sludge treatment (EPC)

100 t fecal + 100 t sludge/day · solid-liquid separation + flocculation dewatering + aerobic fermentation

Package page →
Yibin

Yibin kitchen-waste resource recovery (EPC, Phase I)

200 t kitchen + 30 t oil/day · sorting + three-phase separation + anaerobic

Package page →

Planning a water or wastewater project?

Share your capacity, influent quality, and site constraints. We will respond with a technical outline and delivery approach.

Published with deed.pageReport abuse